Commissioning | Day-1 Stable Output
Complete mechanical/electrical calibration, alignment, and I/O checks; implement cold/hot FAT (Fast Averaging Time); establish initial process formulation and record baseline energy consumption and cycle time; debug the robot, temperature control/cooling, conveying, and online monitoring; acceptance is based on 72 hours of continuous and stable operation.